Post-Construction Cleaning Services
Post-construction cleaning by Everest starts once the trades are off the floor, usually that night or the next morning. We send a written quote within 1 business day.
- Starts at handover
- Dust and debris
- Licensed and insured
Overview
What a final clean covers after the trades leave
Post construction cleaning removes what a build leaves behind: fine drywall dust on floors and racking, sanding film on glass, stickers, painter tape and paint splatter. Everest cleans new builds and renovated commercial spaces, from one suite to a full fit-out, so the space is ready for occupancy.
Our crews start once the trades have finished their work. Debris is staged and labelled for your hauler, or we book the haul with your site contact when dumpster coordination is in the quote. Crews are background-checked, we use eco-friendly products, and every job carries our 100% satisfaction guarantee.
Post construction cleaning in Vancouver and Winnipeg runs through our local desks, so a contractor can send one address and one handover date. For a Vancouver handover, see how rough, final and touch-up passes are scoped and timed. An occupied office that needs a detail pass rather than a build cleanup can book commercial deep cleaning.
What's included
What a post-construction clean covers
-
Debris and packaging removal
Offcuts, packaging and leftover materials are cleared out before the final pass begins.
-
Fine dust removal
Walls and ceilings are wiped and trim is dusted. Beams and racking are HEPA-vacuumed to lift drywall dust.
-
Floors
Hard floors are swept and mopped, and carpet is vacuumed. Ride-on scrubbers cover large floors, and buffing is available.
-
Windows and glass
Stickers and window film come off glass and frames. Paint splatter is removed from mirrors and sills.
-
Washrooms and kitchens
Sinks and counters are cleaned, and fixtures and appliance exteriors are sanitized after install.
-
Final detail
Baseboards, trim, light fixtures and door hardware get a last pass before the walkthrough.
Your written quote confirms tasks and frequency.
When we work
A start time that fits your handover
-
Handover night
The final clean starts the same night the trades are off the floor.
-
Next morning
A morning start when the site is still locked or the trades finish late.
-
Evenings and weekends
Work around occupied floors, move-in dates and building access rules.
-
24/7 crews
Shift crews around the clock when the opening date is close.
How it works
From first call to a clean handover
-
01
Step 1: Tell us about the site
Share the address, floor area, flooring types and the date the trades finish.
-
02
Step 2: We review the scope
We match the stage of the build to the tasks, from dust and debris to glass and washrooms.
-
03
Step 3: Site visit with your contractor
We walk the space with your contractor or project manager. The visit is free.
-
04
Step 4: Receive your written quote
We send a written quote within 1 business day, with the scope and start date listed.
Recent work
Post-construction jobs from our crews
These photos come from real jobs: new office rooms, new washrooms and an ice rink where crews scraped construction residue off rubber flooring and cleaned the glass above the boards.
Related services
Services that follow a construction clean
Floor work, high-reach dusting and turnover cleans often come next.
High-Level Dusting
Boom and scissor-lift dusting of ceilings and beams, with fall protection.
View service
Strip and Wax Services
VCT and resilient floors stripped and recoated once the trades are out.
View service
Move-In and Move-Out Cleaning
Empty suites cleaned top to bottom before the next tenant arrives.
View serviceFAQs
Post-construction cleaning questions
Everything from debris and fine dust to floors and glass, plus washrooms and kitchens and a final detail pass on trim and fixtures. Your written quote lists the tasks for your site. The post-construction cleaning checklist covers each stage in full.
We start once the trades are off the floor and you confirm the handover. Most sites book the same night or the next morning. Give us the handover date and the flooring types when you request a quote, and the written quote lists the start time and the scope.
Yes. Crews HEPA-vacuum beams and shelving, wipe walls and trim, and clear the dust film from VCT and other floors. Air duct and HVAC vent cleaning can be added when dust has reached the air handling system.
Yes. Floor stickers, window film and painter tape come off glass and VCT, and paint splatter is removed from fixtures. Adhesive that needs a floor restorer is quoted as a separate scope, so the written quote shows what is included.
Price depends on floor area, how far the build has progressed, the flooring and glass involved, and your deadline. We send a written quote within 1 business day. A free site assessment is available before we quote, so the number reflects the site as it stands.
Book the final clean before handover
Send the site address, floor area, flooring types and the date the trades finish.
Quote within 1 business day. Free site assessment.