Post-Construction Cleaning Services

Post-construction cleaning by Everest starts once the trades are off the floor, usually that night or the next morning. We send a written quote within 1 business day.

  • Starts at handover
  • Dust and debris
  • Licensed and insured
Crew member cleaning a site after the construction trades leave

Overview

What a final clean covers after the trades leave

Post construction cleaning removes what a build leaves behind: fine drywall dust on floors and racking, sanding film on glass, stickers, painter tape and paint splatter. Everest cleans new builds and renovated commercial spaces, from one suite to a full fit-out, so the space is ready for occupancy.

Our crews start once the trades have finished their work. Debris is staged and labelled for your hauler, or we book the haul with your site contact when dumpster coordination is in the quote. Crews are background-checked, we use eco-friendly products, and every job carries our 100% satisfaction guarantee.

Post construction cleaning in Vancouver and Winnipeg runs through our local desks, so a contractor can send one address and one handover date. For a Vancouver handover, see how rough, final and touch-up passes are scoped and timed. An occupied office that needs a detail pass rather than a build cleanup can book commercial deep cleaning.

Get a post-construction quote

What's included

What a post-construction clean covers

  • Debris and packaging removal

    Offcuts, packaging and leftover materials are cleared out before the final pass begins.

  • Fine dust removal

    Walls and ceilings are wiped and trim is dusted. Beams and racking are HEPA-vacuumed to lift drywall dust.

  • Floors

    Hard floors are swept and mopped, and carpet is vacuumed. Ride-on scrubbers cover large floors, and buffing is available.

  • Windows and glass

    Stickers and window film come off glass and frames. Paint splatter is removed from mirrors and sills.

  • Washrooms and kitchens

    Sinks and counters are cleaned, and fixtures and appliance exteriors are sanitized after install.

  • Final detail

    Baseboards, trim, light fixtures and door hardware get a last pass before the walkthrough.

Your written quote confirms tasks and frequency.

When we work

A start time that fits your handover

  • Handover night

    The final clean starts the same night the trades are off the floor.

  • Next morning

    A morning start when the site is still locked or the trades finish late.

  • Evenings and weekends

    Work around occupied floors, move-in dates and building access rules.

  • 24/7 crews

    Shift crews around the clock when the opening date is close.

How it works

From first call to a clean handover

  1. Step 1: Tell us about the site

    Share the address, floor area, flooring types and the date the trades finish.

  2. Step 2: We review the scope

    We match the stage of the build to the tasks, from dust and debris to glass and washrooms.

  3. Step 3: Site visit with your contractor

    We walk the space with your contractor or project manager. The visit is free.

  4. Step 4: Receive your written quote

    We send a written quote within 1 business day, with the scope and start date listed.

Recent work

Post-construction jobs from our crews

These photos come from real jobs: new office rooms, new washrooms and an ice rink where crews scraped construction residue off rubber flooring and cleaned the glass above the boards.

See before and after photos

Clean tile floor in a new office room with a desk and two chairs after cleaning
Before photo of this room is on the Our Work page.

FAQs

Post-construction cleaning questions

Book the final clean before handover

Send the site address, floor area, flooring types and the date the trades finish.

Quote within 1 business day. Free site assessment.